OPEN PIT OPTIMIZATION AND PRODUCTION SCHEDULING OF OKOBO COAL MINE, CENTRAL NIGERIA

Authors

  • Anthony T. Bolarinwa Department of Geology, University of Ibadan, Ibadan, Nigeria
  • Gideon C. Nwafor Department of Geology, University of Ibadan, Ibadan, Nigeria

Keywords:

Open pit mining, Geologic model, Mine planning, Production scheduling, Okobo coal

Abstract

The Okobo coal in Enjema District of Ankpa Local Government Area of Kogi State, Nigeria is a near surface deposit that is mined through the open pit method. In this investigation, models and plans of the Okobo coal mine produced, using Minex® Gemcom Software, were aligned with depth, strip ratio and optimum pit limits with the aim of defining the most profitable extraction sequence of the coal that will produce maximum possible discounted profit under certain physical and operational constraints. Sandstones, shale and clays constitute the overburden. The topsoil thickness ranged from 0.1 to 0.5 m. Coal recovery was estimated from drill data to be 95%, with losses occurring primarily at the base of the coal seam. Eight (8) expansion pits from the most valuable to the least valuable material were identified using the optimizer. Parametric analysis of mining and processing costs generated an optimized pushback of 1.7 million tonnes of 20.79 Air Dried (AD) MJ/kg coal at 12.35 stripping ratio in the $65 incremental pit. Areas with higher stripping ratio might be more suitable for underground mining. Implementation of these application would reduce cost, improved the Net Present Value (NPV) of the operation and selection of the most economical areas for mining. It is recommended that the mine pits be developed from north to south for optimum productivity.

References

Abdel Sabour, S.A., Dimitrakopoulos, R.G. and Kumral, M. 2008. Mine Design Selection under Uncertainty, Mining Technology, Vol. 117, No. 2, pp. 53-64.

Akaike, A. and Dagdelen, K. 1999. A strategic Production Scheduling Method for an Open Pit Mine, Proceedings of 28th APCOM, pp. 729-738.

Akisa, D.M. and Mireku-Gyimah, D. 2015. Application of Surpac and Whittle Software in Open Pit Optimisation and Design. Ghana Mining Journal, Vol. 15, No. 1, pp. 35-43.

Bernabe, D. 2001. Comparative Analysis of Open Pit Mine Scheduling Techniques For Strategic Mine Planning of a Copper Mine


in Southern Peru. M.Sc. Thesis, Colorado School of Mines, Golden, Colorado.

Cai, Wen-Long and Banfield, F. 1993. Long Range Open Pit Sequencing - A Comprehensive Approach, Proceedings of APCOM Symposium - Montreal, pp. 11-18.

Camus, J.P. and Jarpa, S. G. 1996. Long Range Planning at Chuquicamata Mine, Proceedings of 26th APCOM Symposium, pp 237 to 241.

Dagdelen, K. 1992. Cut-off Grade Optimization, Proceedings of 23 APCOM symposium, pp. 157-165.

Hochbaum, D. and Chen, A. 2000. Performance Analysis and Best Implementations of Old and New Algorithms for the Open-Pit
Mining Problem. Operations Research, Vol. 48, No. 6, pp. 894-914.

Hoerger, S. 1999. Long Term Mine and Process Scheduling at Newmont's Nevada Operations, Proceedings of 28th APCOM Symposium, Colorado School of Mines, Golden, Colorado, pp 739- 748.

Lane, K. F. 1988. Economic Definition of Ore - Cutoff Grades Theory and Practice. Mining Journal Books Limited, London.

Lerchs, H. and Grossmann, I. F. 1965. Optimum Design of Open Pit Mines, Transactions, Canadian Institute of Mining and Metallurgy, Vol. LXVIII, pp. 17-24.

Newman, A.M., Rubio, E., Caro, R., Weintraub, A. and Eurek, K. 2010. A Review of Operations Research in Mine Planing, Interfaces, Vol. 40, No.3, pp. 222-245.

Picard, J.C. and Smith, B.T. 2004. Parametric Maximum Flows and the Calculation of Optimal Intermediate Contours in Open Pit Mine Design. INFOR Journal, Vol. 42, No. 2, pp. 143-153.

Tolwinski, B. 1998. Scheduling Production for Open Pit Mines, 27th Proceedings of APCOM Symposium, London, UK, pp. 651-662.

Whittle, J. 1999. A Decade of Open Pit Mine Planning and Optimization - The Craft of Turning Algorithms into packages, Proceedings of 28th APCOM

Zhang, M. 2006. Combining Genetic Algorithms and Topological Sort to Optimize Open-Pit Mine Plans, Mine Planning and Equipment Selection (MPES) – Cardu, M., Ciccu, R., Lovera, E. and Michelotti, E. (Eds.), Proceedings of 15th International Symbosium, pp. 1234-1239.

Downloads

Published

2019-04-29