EVALUATION OF EFFECTS OF EXTERNAL FACTORS ON DUE DATES PREDICTION IN MANUFACTURING JOBSHOPS

Authors

  • M O Idris Mechanical Engineeering Department, Osun State University, Osogbo

Keywords:

External factors, Prediction, Due Dates, Severity, Electricity

Abstract

Where jobs of different types enter and leave floorshop in a random manner, accurate prediction of due dates is affected by internal and external factors. Most existing studies on jobshops have paid little or no attention to the effects of external factors which could be crucial to due date predictions particularly in developing countries. Hence, there is need to consider the severity of external factors alongside the inherent internal factors in order to arrive at reliable due dates prediction in jobshops. This study proposed a framework for the identification of salient factors that severely affect the due dates in developing economy. The study closely monitored the due dates predictions for12 selected jobshops in Southern Nigeria spanned a period of six months and related it with the external factors surrounding the operations of the jobshops. The variation among the expected and actual due dates were visualized and factors responsible for their variation were identified. The results, when statistically analysed, revealed that meeting due dates is largely depends on factors like regular supply of electricity, good road network, competitions, socio-economy status of the location, and among others, in varying degrees.

References

Iwayemi, A. (2008). Investment in Electricity Generation and Transmission in Nigeria: Issues and Options. International Association for energy Economics, 137-421.
Jain, A. S. and Meeran, S. (1999). Deterministic Job-Shop Scheduling: Past, Present and Future. European Journal of Operation Research, 113, 390-434.
Johnson, S. M. (1954). Optimal-Two-and-Three-Stage Production Schedules with Set-Up Times Included. Naval Research Logistics Quarterly, 1, 61-68.
Lee, C. Y., Lei, L., and Pinedo, M. (1997).Current Trends in Deterministic Scheduling.Annals of Operations Research, 70, 1-41.
Liu, C. H. (2012). Job Shop Scheduling with Fixed Delivery Dates. Proceedings of the International Multi Conference of Engineers and Computer Scientists, vol. II, IMECS 2012,March 14-16, Hong Kong.
Mustapha, M. (2011). Impact of Transportation on Economic Growth: An Assessment of Road and Rail Transportation Systems. Retrieved on 3rd March 2015 from http://mustaphamuktar.blogspot.com/2011/01/impact-of-transportation-on-economic.html
Obembe, J. J. (2016). Investigation into Causes of Project Failure in Akure Metropolis, Ondo State, Nigeria.Journal of Engineering and Engineering Technology. Vol 10 No: 2 pp53-60.
Ofem, B. I. (2012). A Review of the Criteria for Defining Urban Areas in Nigeria.Journal of Human Ecology, 37(3), 167-171.
Ofem, B., Okwuashi, O., Isong, M., Nwanekezie, O., and Eyoh, A. (2012).Urban development Classification of Akwa-Ibom State, Nigeria Using K-Means Algorithm. Retrieved on 17th April, 2015 from http://www.cenresinpub.org/pub2/Urban%20 Development%20Classification%20of%20Akwa-Ibom%20State.pdf
Özgüven, C., Özbzkir, L. and Yavuz, Y. (2010). Mathematical models for Job-Shop Scheduling Problems with Routing and Process Plan Flexibility. Applied Mathematical Modelling, 34, 1539-1548.
Patil, R. and Lawrence, S. (2003). Setting Due Date and Scheduling Jobs to Maximize Customer Satisfaction and Profits. Retrieved on 23rd April 2015 at http://leeds-faculty.colorado.edu/lawrence/Research/CustSatSched/Customer%20Satisfaction%20and%20Job%20Shop%20Scheduling.pdf
Rou, L. Y. and Asmuni, H. (2010). A Study of Cooperative Co-Evolutionary Genetic Algorithm for solving Flexible Job shop scheduling Problem. World Academy of Science, Engineering and Technology, 4,333-338.
Said, N., Mouelhi, W., and Ghedira, K. (2015). Classification Rules for the Job Shop Scheduling Problem with machine Breakdowns. International Journal of Information and Electronics Engineering, 5(4), 300-304.
Samuel, U. P. and Lionel, E.(2013). The Dynamic Analysis of Electricity Supply and Economic Development: Lessons from Nigeria. Journal of Sustainable Society, 2(1), 1-11.
Sharma, P., & Jain, A. (2016). New setup-oriented dispatching rules for a stochasticdynamic job shop manufacturing system with sequence-dependent setup times.ConcurrentEngineering, 24(1), 58–68.
Smith, M. L. and Seiddmann, A. (1983). Due Date Selection Procedures For Job-Shop Simulation.
Udah, E. B. (2010). Industrial Development, Electricity Crisis and Economic Performance in Nigeria.European Journal of Economics, Finance and Administrative Sciences, 101-121.

Downloads

Published

2019-04-28